翻訳と辞書
Words near each other
・ Chrysler Drifter
・ Chrysler E platform
・ Chrysler E-Class
・ Chrysler ecoVoyager
・ Chrysler Europe
・ Chrysler Executive
・ Chrysler F platform
・ Chrysler Falcon
・ Chrysler Festival
・ Chrysler Fifth Avenue
・ Chrysler Firepower
・ Chrysler flathead engine
・ Chrysler Formation
・ Chrysler Freeway
・ Chrysler Hall
Chrysler Headquarters and Technology Center
・ Chrysler Hemi engine
・ Chrysler Hemi-6 Engine
・ Chrysler House
・ Chrysler Hurricane engine
・ Chrysler Imperial
・ Chrysler Imperial Parade Phaeton
・ Chrysler IV-2220
・ Chrysler J platform
・ Chrysler JA platform
・ Chrysler Java
・ Chrysler K platform
・ Chrysler L platform
・ Chrysler LA engine
・ Chrysler LeBaron


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Chrysler Headquarters and Technology Center : ウィキペディア英語版
Chrysler Headquarters and Technology Center

The Chrysler Headquarters and Technology Center is the world headquarters and main research and development facility for the automobile manufacturer Chrysler Group LLC in the United States. It is located in the Metro Detroit suburb of Auburn Hills, Michigan. Completed in 1996, the complex has on located near Interstate 75.
==Design==
CRSS ArchitectsCaudill Rowlett Scott known as (CRS-Sirrine) and (CRSS) of Houston, Texas, was succeeded by the Jacobs Engineering Group of Pasadena, California.〕 designed the Chrysler Technology Center in a cross-axial formation where its elongated atrium topped concourses converge with an octagonal radiant skylight at its center. The rounded-off exterior corners are meant to evoke a polished car body. It was reported on an NPR game-show that according to a ''Businessweek'' article, the Chrysler headquarters was designed so that it could be converted to a shopping mall. It was later reported, based on mall industry analysis and speculation from local real estate investors, that the mall design story was a hoax. Chrysler also has executive offices at the landmark Chrysler House in downtown Detroit.
The facility includes a full laboratory level with various wind tunnels, 1.8 mile evaluation road, noise/vibration facility, electromagnetic compatibility center, environmental test center (able to create rain, snow, and extreme temperatures), pilot production plant, and wind tunnel with thermal testing capability. A 57,000 square foot training center was included from the start, with a teleconferencing center and fitness center. The basement hallways are large enough for two cars to pass each other, allowing some testing within the building; and the test cells have their own separate foundation, to avoid vibrating the rest of the complex.〔(【引用サイトリンク】title= Chrysler Technical Center (CTC) and Auburn Hills Complex )

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Chrysler Headquarters and Technology Center」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.